CHAUVET Professional Relights Beverly Hilton Pool

At the Beverly Hilton AquaStar Pool, Hollywood celebrities fresh from the Golden Globe Awards, Oscar Nominees Luncheon, or one of the 100 or so other red carpet events held at the hotel annually frequently gather to mingle. Recently, the famous pool deck has become even more dazzling, thanks to a collection of CHAUVET Professional and ILUMINARC fixtures installed by AMP’D Entertainment. The new pool lighting system is intended to give the iconic pool deck an updated, vibrant look. Flexibility (along with a generous serving of color) were the key factors in selecting the fixtures used.

“There are many color schemes that we are running on an annual day-clock control system, as well as schemes that will be accessible via local manual overrides or via a custom web interface accessible via any web enabled device,” said Arteen Kharrat, owner of AMP’D Entertainment, who served as the designer and lead installer on the project. “Color was a major factor in this modernization. However our main goal was to make the pool deck more organic and flexible without bringing in additional equipment.”

pool lighting

Kharrat explained why flexibility was an extremely important factor in this design. “The pool deck is a major part of the hotel, with literally hundreds of events on it each year,” he said. “The pool is the only hotel-owned Olympic sized pool in Los Angeles. There is a restaurant adjacent to the pool deck that serves three meals a day, and a very lively bar and evening scene down there as well. Also, there is a breezeway that overlooks the pool area that is utilized nightly as a pre-function and post-function space for the hotel’s world-renowned International Ballroom (IBR), which many across the globe know as the ‘home’ to the annual Golden Globes. So overall this was all about creating a wide range of options and being organic so we could light the space nightly per the requirements of the occasion.”

Kharrat and his team achieved this goal by drawing on the versatility and color rendering capabilities of the Ovation E910-FC color mixing ERS-style fixture and Colorist Pod 7Qa RGBA fixture. A collection of 22 Ovation E910-FC units and 24 Colorist fixtures were installed around the pool deck under an overhang for protection from the elements, but above eight existing 17’ tall hedge walls.

In addition to the fixtures installed around the pool deck, 16 Colorist Pod 7Qa units were mounted in a large tropical planter that is used to provide privacy for the poolside restaurant. Another nine Colorist fixtures were mounted near the tops of three very tall palm trees to lend added pop to the pool design.

The system is controlled via an Interactive Technologies Cue Server Pro CS-900. “This allows day-by-day time-clock control and many universes of control via ACN, utilized extensively across the property,” said Kharrat. “Our client has an iPad App controller for custom color schemes for events. For larger more involved events, we can come in with moving lights and other supplemental equipment and patch-in via DMX or CAN into the system.”

Adds Kharrat, “Our biggest challenge was to find an articulating boom lift that could fit between a 3’9” corridor to install the palm tree fixtures. There are only three entryway points to the pool deck, two of which were cost prohibitive, leaving the 3’9” corridor as our only option. After weeks of searching and dozens of phone calls, my assistant, Nicole Marcario, was able to find where we could get such an aerial work platform. It turns out there are only two such lift models in existence — and only 2 units are available for rent west of the Mississippi — but we found it!”

It is estimated that the Beverly Hilton will be saving approximately $7,500 in lamp changes and maintenance annually by switching from incandescent to LED fixtures.

“We did a side-by-side shootout with the Ovation E910-FC and its big name competitor, and found they metered almost identically, but the Ovation was half the cost and designed with a significantly more intuitive menu structure,” said Kharrat. “We have actually replaced all of our existing rental stock with these new E910-FCs, and the crew/clients have been very, very happy with the change.”

In fact, Kharrat, credits the new Ovation fixture with helping the pool project get off the ground. “We have been taking care of the Beverly Hilton’s lighting needs for a long time,” he said. “There had been talk about updating the pool deck lighting system for some time, but cost was always an issue. When Chauvet approached me with their new E910-FCs, I knew right then that this was a project for them. I approached the hotel to let them know that finally there was a product that was priced right and built right to meet their needs. So we revised the design from two years earlier, got a little more serious about it, got the green light, and off we went! From approval to completion, 21 days.”