Construction & Retrofit Topics

Delivering an infrastructure to meet operational needs calls for a holistic approach and attention to technology trends.


Delivering an infrastructure to meet operational needs calls for a holistic approach and attention to technology trends.

FM Issue Bonus: Powering The Evolving Facility

Construction & Retrofits Articles

FM Issue Bonus: Powering The Evolving Facility

FEJulyAug16-FMIssueBonus-Featured

Delivering an infrastructure to meet operational needs calls for a holistic approach and attention to technology trends.


20,000 Plastic Spheres For JFK Performing Arts Center Expansion

blow molding

The design incorporates long spans without the use of beams and lightens the structure by displacing approximately 30% of the concrete normally required for a comparable flat slab.