Beijing

Microsoft Beijing Campus Cuts Energy Footprint

Working with Johnson Controls, Microsoft was able to achieve energy savings of nearly 30% at its Beijing Campus through continuous retrofitting and optimization.

Microsoft Beijing Campus Cuts Energy Footprint

Microsoft Beijing
Working with Johnson Controls, Microsoft was able to achieve energy savings of nearly 30% at its Beijing Campus through continuous retrofitting and optimization.

Microsoft Beijing Campus Cuts Energy Footprint

Microsoft Beijing
Working with Johnson Controls, Microsoft was able to achieve energy savings of nearly 30% at its Beijing Campus through continuous retrofitting and optimization.

2018 Maintains Skyscraper Construction Momentum

China has maintained its reign as the most prolific country when it comes to the construction of tall buildings, with 88 completions in 2018.

Receive the latest articles in your inbox