HVAC Factor Column | Facility Executive - Creating Intelligent Buildings

Throughout the year, this ceiling mounted equipment can take a load off a facility's other mechanical equipment.


https://facilityexecutive.com/2011/04/the-hvac-factor-high-volume-low-speed-fans/
Throughout the year, this ceiling mounted equipment can take a load off a facility's other mechanical equipment.

Facebooktwitterredditpinterestlinkedintumblrmail

HVAC Factor Column

Latest: The HVAC Factor: High Volume, Low Speed Fans - Throughout the year, this ceiling mounted equipment can take a load off a facility's other mechanical equipment.

The HVAC Factor: High Volume, Low Speed Fans

Throughout the year, this ceiling mounted equipment can take a load off a facility's other mechanical equipment.

The HVAC Factor: Preventing Equipment Failure

A predictive maintenance program continuously monitors HVAC systems with the goal of avoiding costly breakdowns.

The HVAC Factor: The Mounting Case For MCPs

Modular Central Plants (MCPs) could pay off in four markets that are poised for growth.

The HVAC Factor: Water Treatment Services

Selecting a provider for cooling tower and related equipment operations should be based on the facility

The HVAC Factor: Radiant Cooling

Increasingly paired with radiant heating, this hydronic system can greatly reduce energy consumption in the right scenario.

The HVAC Factor: Maintaining Comfort In A Changing Environment

During facility renovations, renting HVAC equipment can play a key role in a smooth project.

The HVAC Factor: Moisture Management

Cooling and ventilation parameters are key to maintaining proper indoor air quality.

HVAC Trends: The New HVAC

Smaller, more efficient packaged systems and intelligent controls are anticipated for 2010.

The HVAC Factor: Remote Monitoring Services

Depending on in-house resources, hiring an outside firm to track HVAC systems can be useful.

The HVAC Factor: The ABCs Of UVC

This technology works to keep HVAC systems clean from the inside out.

The HVAC Factor: Ductless Mini-Splits

In certain spaces, this type of system can ease the demand on a facility manager

The HVAC Factor: Watch Out For Roadblocks

Guest Contributer Karl Decker discusses three scenarios that can throw a construction project off track.

The HVAC Factor: HCFC Phase Outs On The Way

Guest Contributor Colleen Hughes explains how the manufacture of a commonly used refrigerant will cease at the end of 2009.

The HVAC Factor: The Role Of Air Filtration

Evaluating three performance factors enables facility managers to install the best filter for the job.

The HVAC Factor: Cleaning The Systems

A consistent, effectively designed program will keep HVAC equipment in top condition.

The HVAC Factor: Net-Zero-Energy Buildings

Can these types of facilities be market viable by 2030?

The HVAC Factor: Predictive Maintenance

This condition based approach to servicing HVAC equipment can help to anticipate problems.

HVAC Trends: Tomorrow’s HVAC

Managers can reduce damage to the environment and protect occupants with new HVAC technologies.

Stay Connected

1,861FansLike
336FollowersFollow
40,000FollowersFollow
9,432FollowersFollow

Featured Video

If Sitting’s The Problem, Is Standing The Solution? | Technology Meets Ergonomic Comfort

Thanks to research from heavy hitters like The Mayo Clinic, most of us are aware that excessive sitting is a serious health risk. That’s why VARIDESK made their products affordable and accessible to everyone - whether you sit in a cubicle or a corner office.

Featured Knowledge Channels

Sustainable Commercial Roofs | Reduce, Recycle & Reimagine Sustainability

Duro-Last Roofing Systems offer proven chemistry and decades of sound performance. As the commercial roofing industry’s leader in manufacturing prefabricated PVC roofing systems, Duro-Last produces roofing membranes with a history of providing long-term durability and watertight protection.