Tag: Firewall

The Post‐Frame Fire Wall: New, Tested, And Economical

An hourly rated wall—rated as high as three hours—is often required to separate building areas or occupancy types to meet the IBC requirement for life safety. For architects, builders, and engineers, that traditionally has meant using a rated eight‐inch or 10‐inch concrete block wall on a concrete foundation, but with this recent test exceeding hour‐rating expectations, that may no longer be the case.
Workforce Shortages Webinar

Effective Strategies To Stay Ahead Of Workforce Shortages

During this free webinar, you'll learn the top 5 strategies that facility maintenance pros are implementing to overcome workforce shortages.
Webinar, Facility Capital Improvements

View This Free Video Webinar: Maximizing Value For Facility Master Planning

A panel of Facility Management leaders discuss long-term planning challenges and answer questions about maximizing the value of conducting a Facility Condition Assessments (FCA).

[VIDEO] Collect Asset Data at the Speed of Walking a Building

AI powered data collection with AkitaBox Capture. Take a picture of the asset nameplate, touch the floor plan to locate the asset and move to the next asset. Save up to 90% of your time in the field with AkitaBox Capture AI.