football field | Facility Executive - Creating Intelligent Buildings

Download this case study from Legrand and find out how the Outdoor Ground Box survived 53 inches of water from Hurricane Harvey without missing a beat.


https://facilityexecutive.com/2018/09/alvin-high-school-outdoor-ground-box-tested-texas/
Download this case study from Legrand and find out how the Outdoor Ground Box survived 53 inches of water from Hurricane Harvey without missing a beat.

football field

Commercial building and facilities management resources for corporate facility executives, building operators and facility managers in all industry and service sectors. football field articles below.


Alvin High School: Tested In Texas

Download this case study from Legrand and find out how the Outdoor Ground Box survived 53 inches of water from Hurricane Harvey without missing a beat.

Stay Connected

1,861FansLike
352FollowersFollow
40,000FollowersFollow
9,463FollowersFollow

Featured Video

Open Square Leverages Connectrac for Collaborative Space

When Archbright consolidated its three offices into one 22,000-square-foot Seattle location to help build a unified culture, their tenant improvements for the new building included furniture and workplace technology from OpenSquare and Connectrac.

Featured Knowledge Channels

Sustainable Commercial Roofs | Reduce, Recycle & Reimagine Sustainability

Duro-Last Roofing Systems offer proven chemistry and decades of sound performance. As the commercial roofing industry’s leader in manufacturing prefabricated PVC roofing systems, Duro-Last produces roofing membranes with a history of providing long-term durability and watertight protection.