Steven Holl | Facility Executive - Creating Intelligent Buildings

The design incorporates long spans without the use of beams and lightens the structure by displacing approximately 30% of the concrete normally required for a comparable flat slab.


https://facilityexecutive.com/2016/08/20000-plastic-spheres-for-jfk-performing-arts-center-expansion/
The design incorporates long spans without the use of beams and lightens the structure by displacing approximately 30% of the concrete normally required for a comparable flat slab.

Steven Holl

Commercial building and facilities management resources for corporate facility executives, building operators and facility managers in all industry and service sectors. Steven Holl articles below.


20,000 Plastic Spheres For JFK Performing Arts Center Expansion

The design incorporates long spans without the use of beams and lightens the structure by displacing approximately 30% of the concrete normally required for a comparable flat slab.

Featured Video

Introducing Seos®: The Next Generation of Credential Technology

Powered by highly advanced encryption and a software-based infrastructure, Seos secures trusted identities on any form factor and can be extended for applications beyond physical access control. Learn more at hidglobal.com/seos.

Featured Knowledge Channels

Sustainable Commercial Roofs | Reduce, Recycle & Reimagine Sustainability

Duro-Last Roofing Systems offer proven chemistry and decades of sound performance. As the commercial roofing industry’s leader in manufacturing prefabricated PVC roofing systems, Duro-Last produces roofing membranes with a history of providing long-term durability and watertight protection.