UMN Pioneer Hall Project Receives PCI Design Award

The renovation and expansion of historic Pioneer Hall at the University of Minnesota was honored with a design award from the Precast/Prestressed Concrete Institute (PCI).

The $104.5 million renovation and expansion of historic Pioneer Hall at the University of Minnesota was honored March 6 with its second design award of the year—this time by the Precast/Prestressed Concrete Institute (PCI). The project also received a Grand Award in January from the American Council of Engineering Companies of Minnesota (ACEC/MN).

Pioneer Hall The 57th annual PCI Design Awards showcase the creative and innovative use of precast and prestressed concrete in a variety of applications. A panel of industry experts that includes precast concrete producers, engineers, and architects judged the nominees. The buildings and transportation categories were judged on aesthetic, structural, and use versatility; site, energy, and operational efficiency; risk reduction; and resiliency, such as structure durability, multi-hazard protection, and life safety and health.

Pioneer Hall won in the Higher Education/University building category. Wells Concrete of Albany, MN provided the precast concrete on the project. KWK Architects led the design effort on the project, partnered with architecture/engineering firm-of-record TKDA of St. Paul, MN.

KWK Principal Sara Koester said specifying precast concrete panels on the Pioneer Hall project design was the right choice, for a variety of reasons.

“Precast insulated concrete panels are an excellent exterior wall system. Precast insulated panels helped to achieve the energy goals and exterior wall thermal performance that we wanted on the project, while being very cost effective,” said Koester. “The exterior expression that we were able to achieve through use of the precast concrete panels complemented the existing historic building character. The precast concrete panels also offered us the ability to design with precast trim to animate the exterior at an affordable cost and they enabled the building’s exterior skin to be completed and enclosed quickly, which was very important on the project’s tight schedule.”

The newly renovated and expanded 90-year-old Pioneer Hall opened for the fall 2019 semester. The project increased the number of student beds at the residence hall from 693 on four floors to 756 on five floors, while preserving a significant amount of the structure’s historic Georgian Revival-style exterior. The renovation also increased the hall’s total square footage from 177,000 square feet to 257,000 square feet, with demolition of the existing building limited to the center construction and within the courtyards, with approximately 60% of the typical upper floors being retained.

A new 42,000 square foot dining facility was also built with seating for 850 students that features eight venues arranged in a Main Street configuration. A new central, sub-basement level was built to accommodate new mechanical, electrical, and telecom rooms.

The renovated residence hall features accessible, community-style living unit modules with a small group of residents sharing a community bathroom. These facilities are grouped with single-use private bathrooms to offer varying levels of privacy. Studies and lounges are provided for the communities, and a dedicated floor lounge allows for larger gatherings. Classroom, multipurpose, music practice, recreation rooms, large student kitchen, meditation, and tech/business center provide a variety of spaces for students to gather, study, or relax.

 

Want to read more about facility construction?

Read more news related to Construction & Retrofit topics.

Building Envelope, Construction, FacilityBlog, Featured

57th annual PCI Design Awards, ACEC, American Council of Engineering Companies of Minnesota, architecture, design award, facility renovation, facility-expansion, Grand Award, Higher Education/University, KWK Architects, Minnesota, PCI, Pioneer Hall, Precast Concrete, Precast/Prestressed Concrete Institute, prestressed Concrete, renovated residence hall, TKDA, University of Minnesota, Wells Concrete

Sponsored Content
Featured Video

Webinars, Podcasts & Videos

Under the care of ABM, systems perform, businesses prosper, and occupants thrive.

Where Others See a Facility, We See Possibility

Under the care of ABM, systems perform, businesses prosper, and occupants thrive.

crime scene

Listen Now: What To Do When Your Facility Becomes A Crime Scene

A business continuity analyst discusses steps FM teams need to consider after a crime has been committed in their buildings.

Facilities Teams, ARC Facilities Webinar

Did You Miss Our “Solving The Hidden Assets Challenge” Webinar?

Hidden assets can be a challenge for facilities teams. View this free video webinar on demand and learn how your team can retain knowledge and streamline operations.

Receive the latest articles in your inbox

Share to...